21 November 1996

REPORTS ON ITS HIRED WORKS AT EASTERN SEABOARD INDUST

Sino-Thai Engineering & Construction Plc (STECON) reported that the company was hired to construct the road and drain system under the road and bridge , also rain drain and collective waste water system. And pipe water distribution system in Phase 2B and 2C in Eastern Seaboard Industrial Estate (Rayong) Co.,Ltd. with the Project's value worth Bt427,811,215. The Project was located at Eastern Seaboard Industrial, Rayong. The details were reported as follows: 1. Date of transaction : November 14, 1996 2. Related partner (Employer) : Eastern Seaboard Industrial Estate (Rayong) Co.,Ltd. 3. Project's owner : Eastern Seaboard Industrial Estate (Rayong) Co., Ltd. 4. Project's location : At Eastern Seaboard Industrial Estate, Rayong 5. Project's value : Bt427,811,215 6. Details of the Project : To construct the road and drain system under the road and bridge , also rain drain and collective waste water system. And pipe water distribution system in Phase 2B and 2C in Eastern Seaboard Industrial Estate (Rayong) Co.,Ltd. 7. Project' s period : From November 15, 1996 to November 14, 1998